Covid 19 : Day 27 of lock-down : Getting some pallet projects finished

Fantastic day for working outside.
Got straight into the table and chair this morning.

Bloody tool caught and flipped out a huge sliver of wood. Decided to live with it. The whole piece is a bit irregular.
Removed so much material from the legs (which started off as cubes) that they became a bit wobbly. Cut some holes and bolted the legs down with some salvaged roofing bolts.

     b 


The table is done but for the ‘finish’.



Finished the sculpting and construction on the chair. Next step is the ‘finish’ which I’ll leave for a bit.



End of the day was pretty sublime.

Comments

You also might like...

Hostel : Glasgow : Night moves

Grape update: Jan

Winter garden established for 2024